翻訳と辞書
Words near each other
・ Kolkata International Film Festival
・ Kolkata Knight Riders
・ Kolkata Knight Riders in 2008
・ Kolkata Knight Riders in 2009
・ Kolkata Knight Riders in 2010
・ Kolkata Knight Riders in 2011
・ Kolkata Knight Riders in 2012
・ Kolkata Knight Riders in 2013
・ Kolkata Knight Riders in 2014
・ Kolkata Knight Riders in 2015
・ Kolkata Knight Riders in 2016
・ Kolkata Little Magazine Library And Research Center
・ Kolkata LRTS
・ Kolkata Mail
・ Kolkata Metro
Kolkata Metro Line 2
・ Kolkata Metro Rail Corporation
・ Kolkata metropolitan area
・ Kolkata Metropolitan Development Authority
・ Kolkata Mirror
・ Kolkata Monorail
・ Kolkata Municipal Corporation
・ Kolkata Museum of Modern Art
・ Kolkata Orthodox Diocese
・ Kolkata Patna Garib Rath Express
・ Kolkata Police community policing initiatives
・ Kolkata Police Force
・ Kolkata Police Friendship Cup Football Tournament
・ Kolkata Port (Vidhan Sabha constituency)
・ Kolkata Race Course


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Kolkata Metro Line 2 : ウィキペディア英語版
Kolkata Metro Line 2

Line 2, also known as East-West corridor of the Kolkata Metro is a rapid transit system under construction which will serve Kolkata, Salt Lake and Howrah in the Indian state of West Bengal underneath the Hooghly River. It would consist of 12 stations from Salt Lake Sector V in the east to Howrah Maidan in the west, of which 6 would be elevated and 6 would be underground, with a total distance of 14.67 km.
==History==
The master plan had already identified the corridor way back in 1971. But the experience of India’s first metro and the success of the Delhi metro network contributed to the sanction of the East – West Metro corridor which will connect Howrah Railway Station with the Satellite City of Salt Lake underneath the Hooghly River. In January 2004, Pacific Consultant International Group conducted a feasibility study for the line. The report proposed the route and tubular structures under the Hooghly River.
A new organisation was formed known as Kolkata Metro Rail Corporation Limited (KMRC) which will be executing the operations of this Line thus starting the physical construction in 2009. Of KMRC's eight directors, four each are from the state and central governments. The cost is being shared between the state government (30 per cent), the Union Urban Development Ministry (25 per cent), and the Japan Bank for International Cooperation (JBIC) (45 per cent). But as of 2011 most of the share of this project went to Indian Railways with Japan Bank for International Cooperation (JBIC). The project is estimated at a cost of .〔http://www.thehindubusinessline.com/industry-and-economy/logistics/article3650126.ece?homepage=true&ref=wl_home〕
But due to some major set backs the project got delayed. These were mainly due to Land Acquisition, slum relocation and route alignment problems. The East-West Metro was originally slated to be operational by 2012, but is later pushed back to 2015. The first phase, a stretch of 9 km, is currently expected to be operational in June 2018 and the second phase, 6 km in length, will be operational by June 2019.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)